Friday 29 December 2023

Legs and back boards

 Now back in the shape it should be.

After a few days work over the Christmas break, the layout is now back on its legs in the new shed. I have added the new backboards as I go as I did not want to paint the steel walls.

I have added the sub frame for staging and installed staging on it. I have also installed the new sub frame for the right hand side just inside the door.






I ran out of the 6mm MDF for the center dividing piece.

Off to bunnings to get another sheet then paint it before I install it.

No comments:

Post a Comment