Sunday 17 August 2014

Ft Edward track work and Track power completed

Last Main line town completed.

Over this weekend, after visiting my track supplier (Thanks John Colliver) I managed to complete the final 5 spur tracks at Ft Edward and then power up those tracks.

It was a relatively small task that then enabled some test switching to be completed.

See the pictures below.










The next task is to update the turnout panels at Ft Edward and Saratoga Springs to enable the turnouts to be thrown from the panel.

Then it will be onto the North Creek branch line.

Thanks for checking in.

1 comment:

  1. Ops session is getting closer as each day passes.
    Rod.

    ReplyDelete