Saturday, 3 August 2013

Let the building begin

Let the building begin. (well the pre planning bit anyway)

After the demolition of the old D&H 2nd Sub, I have now cleaned up the room, and stored the timber from the old layout.

Once the room was given the once over with a broom and the temporary carpet was lifted up and also stored, it was time to map out where the new layout will go and get a feel for the space and the width of the isles etc.

I used some masking tape on the concrete floor and mapped out the isles and the dividing wall that runs along the peninsula's.

There are still a few things in the rool that line the wall due to lack of other places to put them.


Then I placed the retained staging in it place to see how things fit..





While things will be a little tight, I'm sure things will work out well..

Until next time..

No comments:

Post a Comment