Saturday, 14 March 2020

JMRI Panel

Time to get going on the JMRI Panel

This week it was time to get going on building the JMRI Panel for the layout.
There is a long way to go..

The 1st steps is to get the basic diagram right and functioning with all the blocks and turnouts showing correctly.

There is also some logix built in to enable trains to automatically enter and exit the North and South staging on tracks 1 or 2.

Here is a sample of the work in progress.

Next is to go and set all turnouts to disabled when occupied. Then to set up NX routes to the dispatcher can set a route. Then this will set the turnouts and signals for the engineer.

Till next time.

1 comment:

  1. Wow progress is finally underway. Good stuff Brendan.
    Rod.

    ReplyDelete