More turnouts completed.
Per my last post, the family and I have taken a road trip holiday to the Gold Coast and the Sunshine Coast in Queensland for 2 weeks. As there is down time needed when on holidays for the kids (and Michelle), I figured I would fill the down time with turnout construction for the layout.
Over the last 2 weeks I have managed to complete 15 turnouts for the layout.
With the 15 completed I now have 6 to go (of the 40 needed in total) before the requirements for the layout is fulfilled.
Building turnouts is most satisfying!...
Here is a pic of 14 of the 15 completed (the last one still has the glue for the wood ties drying.)..
No comments:
Post a Comment