Fascia install
The D&H carpentry crew have been hard at work and have installed the fascia on the lower and upper sections of the layout.
The upper sections have been roughed in for now in terms of the height of the fascia as the scenery in the locations is not yet decided.
Here are a few pictures of the finished product.
Now the fascia is installed, it is time to make turnout control panels for the turnouts. At present they are all connected to DCC turnout drivers so they can all be switched from the throttle.
Once the turnout controls are installed, then a few hutches will be created to be used by the operators to store card cards etc while switching trains in the towns.
No comments:
Post a Comment