Timber work almost done
This weekend I managed to complete the upper deck build.
This includes all the structure and ply deck from the top of the helix to the upper staging.
Included in this section is a lift out bridge across the door way and a 2% grade up to upper staging.
All the cork was laid in the upper staging section before I installed the ply main deck to make the installation of the track easier.
Here are some more pictures showing the room now.
Now to paint the lift out bridge and then get stuck into the centre peninsula backboard / dividing all.
Stay tuned for the next update.