Jobs done..
Just a short sharp update.
The room painting is now complete..
At present it is blue (levent) on the ceiling and walls. Once the main L girder goes onto the wall I will then paint the lower section dark grey / almost black (monument) like I had in the last room.
Then over time, once I get the valance installed then the valance and the isle way ceiling will also be monument.
The door is from the old shed / railway room and still has the black at the bottom.
The blue is fairly over powering at present but wont be an issue once the black is added.
Now I need to complete the painting on the outside of the room and then it is layout build time.
Stay tuned.
Very spiffy.
ReplyDelete