Over this weekend the track gang has been hard at work in Ft Edward.
The main line through town is now complete.
This then completes the section from Ft Edward down to South Staging.
The track and turnouts are not yet powered but the tortoise machines are installed.
Work to power the main line will begin once the main line reaches Whitehall.
Unfortunately the track gang was delayed late today due to the lack of no more gaps!
Here are a few progress pictures.
Ft Edward
Ft Edward
Ft Edward
Main line between Ft Edward and Saratoga Springs
Main line between Ft Edward and Saratoga Springs
Main line between Ft Edward and Saratoga Springs
Main line between Ft Edward and Saratoga Springs bridge load test
Saratoga Springs
Saratoga Springs
Saratoga Springs testing train length
The train was manually moved during the testing via the 0-5-0 switcher.
Thanks for stopping by.
Hopefully by the end of the month the main line through to Plattsburgh will be completed.!
What other word can I use but Wow.
ReplyDeleteGood progress Brendan
Rod.