New track work complete

 New shed, slightly new design, track work done.

With all the timber work complete. I then set out to reconnect all the main bus wires and DC power feeds. Job done.!


Next step was get the track gang out and install he new cork road bed and track. This task is all complete.

The drop down bridge at the door way now has through tracks and extensions to the main yard. Time will tell if I keep the extensions or just remove them later.


Old view

New view


The new return loop and set of turnouts was installed.

Old view.

New view



Then I installed the new track work from Plattsburgh to Fairhaven.
This is where the old layout when up the spiral.

Old view.

New view


Old view

New view.




The new section also includes a shorter around the room continuous run. The old layout did go through the backdrop at this point but was a dead end branch. Now it continues on.

Old View



New View



Now to get stuck into the hidden stuff.. The wiring!.